Smart City Digital Twin
Change conditions in a fictional connected district. See how occupancy, environmental signals and equipment availability influence an explicit automation policy.
Synthetic simulation. All telemetry and power values are illustrative, not project performance evidence.
Operating
Occupied and warm: cooling requested.
Device state
Lighting on· Cooling requested · 12.5kW illustrative demand
Explore smart infrastructure expertise| Asset | Occupants | Lighting | Equipment | Illustrative kW |
|---|---|---|---|---|
| Exchange building | 60 | On | Operating | 12.5 |
| Research centre | 30 | On | Operating | 11.75 |
| Mobility hub | 10 | On | Operating | 11.25 |
Architecture and model assumptions
Synthetic sensors → local policy evaluation → illustrative control requests → telemetry and event history. Production building systems need authenticated devices, network separation, safe local overrides and commissioned control policies.
Power model: 2 kW equipment baseline + 3 kW active lights + 6 kW cooling request + 0.025 kW per occupant. These arbitrary demonstration coefficients are not engineering estimates, measured energy savings or Smart IoT project results.
Simulation event history
- Initial synthetic sensor snapshot loaded.